Load banks for data centres

← All load banks

Load banks for data centres

A data centre has to prove that UPS, cooling and backup power handle full load before customers move in. A load bank supplies that load before any servers are installed.

Commissioning without servers

During commissioning there are often no servers yet. The load bank stands in for them and gives the same heat and power. You load the site step by step and see how it behaves.

Test the UPS and batteries

Load the UPS with a known load and see how long the batteries last and how the system transfers. Read more under UPS and battery load testing.

Test cooling and airflow

A rack-mounted load bank sits in the rack and gives heat like a real server load. You see how air moves in the hall and whether cooling holds at full power.

Test the backup power

The diesel generators must take the whole load when the grid fails. Test them with a larger load bank. Read more under backup power load testing.

Frequently asked questions

What is a load bank in a data centre?

A load bank is a resistive load that gives power and heat, like real servers. It is used to test UPS, cooling and backup power before the site goes live.

Can the load bank sit in a normal rack?

Yes, there are rack-mounted models. Tell us the power you need and we send a datasheet.

Can I test both the racks and the backup power?

Yes. The rack models suit UPS and cooling, the larger load banks suit the generators.

What does a load bank cost?

Indicative prices are shown on the B500L and S1000L product pages. Contact us for a quote.

Request a quote

Tell us what you need to test. We reply within one business day with a price including freight to your site.

  • Help choosing the right size
  • Lead time on request
  • Reply within one business day

Thanks! Your email app opens with the request. We will reply within one business day.

Nothing happened? Then this device has no email app set up. Copy the request and send it to info@deepgrid.net.

Request a quote